CHALLENGE

Create a cost effective process to automate document control, eliminate paper and give the project team instant access to all project information.

SOLUTION

FACS Project Controller

San Diego County Water Authority

The San Diego County Water Authority (SDCWA) is a public agency serving the San Diego region as a wholesale supplier of water from the Colorado River and Northern California. The Water Authority’s mission is to provide a safe and reliable supply of water to its 24 member agencies serving the San Diego region’s $186 billion economy and its 3.1 million residents servicing five major pipelines totaling approximately 300 miles. The San Diego County Water Authority’s Relining Pipeline Program rehabilitates and extends the life of aging water delivery pipelines. The relining process involved inserting steel liners into existing pipelines to reinforce them to prevent water leaks and breaks to help ensure a safe and reliable water supply for the region’s future. To manage the complex Relining Pipeline Program SDCWA needed a solution that would streamline the document control process, improve visibility to quantity tracking and reduce their dependency on older, paper based process. SDCWA selected FACS’ Project Controller, a cloud-based construction management software, to manage their project. With Project Controller, SDCWA was able to automate their document control process eliminating both paper and time delays in the review and approval process, improve inspector’s reports through mobile access to project information and provide the full project team instant access to the most up-to-date project data.

“Using Project Controller we were able to improve our old way we would do inspection reports with excel spreadsheets. Having all information pre-loaded in the system were able to accurately track all quantities and see what work was completed simply by running daily reports.”

– Brent F. Project Engineer, SDCWA

Project Controller’s mobile field reporting feature allowed inspectors to complete daily work reports from the field, speeding up approval times and eliminating the need for duplicate data entry. Information entered into the system from the field is instantly available to managers ensuring that quantities are tracked correctly and issues are resolved before they cause schedule delays. The relining pipeline project consisted of five phases with five scheduled pipeline shutdowns, which required 24-hour construction work and activities. With ten users consisting of consultants, contractors and different departments from within the SDCWA there was a need to streamline the standard paper and e-mail based document control process. With Project Controller, the entire team had clear visibility to all pending Submittals and RFIs and with built in review, ball-in-court and approval workflows everyone knew exactly who had the next action on a specific document. With Project Controller managing the document control process the project team was able to focus on the content of RFIs and Submittals allowing them to reduce delays and completing phases of the project ahead of schedule.

“Using Project Controller we were able to improve our old way we would do inspection reports with excel spreadsheets. Having all information pre-loaded in the system were able to accurately track all quantities and see what work was completed simply by running daily reports.”

– Brent F. Project Engineer, SDCWA

With the implementation of FACS Project Controller, the SDCWA achieved their goal of creating a cost effective process to electronically manage document control, eliminate paper-based delays, improve inspection reporting and give the project team instant access to all project information. Please visit our website www.facsware.com to learn more about how FACS Project Controller can help your team realize some of these savings on their next project.

“FACS Project Controller allowed us to significantly cut back time reviewing, routing and managing documents. Having all of our project information available in one place with ability to access through the cloud allowed us to speed up the approval processes, saving staff time and money.”

– Brent F. Project Engineer, SDCWA