| |
Construction Management
Wasting time waiting for documents to be delivered or changes to be approved?
Are increasing administrative duties decreasing your staff’s time in the field?
Are vast amounts of paperwork becoming overwhelming and impossible to track?
Having difficulty keeping your time/cost estimates updated?
Do wish you had a complete project archive after closeout? |
FACS Delivers:
Improved Efficiency
-
Field inspection staff have instant access to all the references and forms needed to complete
their duties.
-
Documents such as Inspector Reports and RFIs are generated in the field and instantly transmitted.
-
Unplanned trips between the field office and job site are reduced by each inspector having
continuous access to all project plans, documents and forms.
Increased Accuracy
-
Each inspector will have all the references and documents needed (plans, specs, etc) to verify that the work is being completed in reasonable conformance with the latest appropriate plans, specifications and shop drawings.
-
Reduce the possibility of costly mistakes such as the wrong plan, spec or shop drawing being used.
Expedited Decision Making Process
- When communications between the engineer and inspection staff is made more efficient, facts can be gathered, processed and decisions or information can be conveyed more rapidly.
Reduction of Copying and Copy Paper usage
- Reduce the paper copies and cost of distribution of such materials to field inspection staff as part of the ongoing effort to reduce the carbon footprint of public works projects.
A Comprehensive Project Archive
- All correspondence and project documentation is fully searchable in the system from design through project closeout providing a complete audit trail and project archive.
|
|
|